PINCHER CREEK SWIMMING POOL
Date
Project Client
Procurement
Talbera International Technologies Ltd.
2018
Construction Management
Design Team
Ian Moxon Architect Inc.
Talbera International Technologies Ltd.
BCB Engineering Ltd.
Sunwise Engineering Ltd
1/1
The design was for a new 1890 SF (175 SM) pre-cast concrete building that integrates client-supplied slide equipment and stairs with an addition to an existing pool and community center.
The addition was designed to provide new barrier free change rooms to both the new indoor slide addition and the summertime exterior spray park.